- CLIENTUber Boat by Thames Clippers
- PROJECTAurora Clipper
- PROCEDURE REFERENCEMWI-PRO-001
- TEST LOCATIONTilbury Docks
- NDT INSPECTORMartin Brettell
- CSWIP/PCN LEVELCSWIP Level 2 - 640535
- REPORT NOMWI-REP-1134
- REPORT DATE24/05/2025
- NDT DRAWING NO-
- TEST DATE14/05/2025
- NDT ZONEPort hull plating around P-Bracket
MATERIAL SPECIFICATION AND TESTING CONDITIONS | |
---|---|
MATERIAL TESTED | Aluminium |
SURFACE CONDITION | Smooth, as welded |
MATERIAL TEMPERATURE | Ambient |
VIEWING CONDITION/LIGHT SOURCE | Natural light and LED torch |
MATERIAL THICKNESS (MM) | 5mm, 6mm, 8mm and 10mm |
TEST RESTRICTIONS | None |
WELDING PROCESS | GMAW - Pulse |
POST WELD HEAT TREATMENT | None |

Port Hull Repair
